Mechanical engineering scope
Air quantities, heating and cooling loads, shaft space, ceilings, drainage routes, controls and electrical requirements all shape the final solution. The scope is tailored to the building and the project stage.
HVAC design & equipment replacement
System concepts, air distribution and equipment selection, plus replacement planning for aging rooftop units and other HVAC equipment.
- Heating and cooling load calculations
- Outdoor-air and exhaust requirements
- Air distribution, terminal devices and layouts
- Equipment schedules
- Replacement review: capacity, airflow, curb, electrical data and clearances
Typical triggersAging or failed equipment, comfort complaints, a change of use or a tenant fit-out.
Ventilation & make-up air
Exhaust, ventilation and make-up air design, including commercial kitchen exhaust and industrial make-up air.
- Commercial kitchen hood exhaust and make-up air
- Industrial exhaust and make-up air balance
- Local exhaust and general ventilation
- Fan, duct, discharge and intake routing
Typical triggersA new restaurant or kitchen, a new or modified industrial process, or heat and air-quality issues.
Hydronic heating & chilled water
Boiler and chiller replacements and hydronic systems, from load and operating review to pumps, piping, controls and equipment rooms.
- Boiler and chiller replacement design
- Pumps, piping and valves
- Venting and condensate
- Equipment-room layouts, clearances and service access
- Phasing and temporary heating or cooling plans
Typical triggersEnd-of-life boilers or chillers, recurring operating problems or an efficiency upgrade.
Plumbing & drainage
Domestic water, sanitary and storm drainage, fixture connections, risers and routing, aligned with structure and architecture.
- Domestic water distribution
- Sanitary and storm drainage
- Fixture connections and risers
- Routing with structure and architecture
Typical triggersA fit-out or renovation, added fixtures or a change of use.
Controls & BAS interfaces
Controls intent and sequences documented so mechanical equipment, power, fire alarm and building operation work together.
- Controls and sequence intent
- BAS points, alarms and communication interfaces
- Fire alarm shutdowns and interlocks
- Power and VFD interfaces
Typical triggersEquipment replacement, a BAS upgrade or new equipment joining an existing system.
Mechanical permit drawings
Permit packages for HVAC, ventilation and plumbing work, prepared to the municipality's submission requirements.
- Floor plans, equipment locations and schedules
- Ductwork and piping layouts
- Ventilation information and details
- Heat-loss, heat-gain, duct and ventilation calculations
Typical triggersA new, altered or replaced mechanical system that needs a municipal permit.